2.194 Aufträge, 2,25 Mrd. $, 1.088 verschiedene Unternehmen. 73 % des Werts gingen an Unternehmen des Landes.
Unternehmen mit den meisten Zuschlägen
| Unternehmen | Herkunftsland | Aufträge | Wert | Hauptkategorie |
|---|---|---|---|---|
| NATIONAL DEVELOPMENT ENGINEERS LTD. | Bangladesch | 7 | 131 Mio. $ | Works |
| MONICO LIMITED | Bangladesch | 5 | 88,7 Mio. $ | Works |
| China Road And Bridge Corporation | null | 1 | 66,2 Mio. $ | Works |
| UNITED NATIONS CHILDREN'S FUND (UNICEF) | World | 6 | 63,8 Mio. $ | Non-consulting Services |
| INTERNATIONAL ORGANIZATION FOR MIGRATION (IOM) | World | 3 | 63 Mio. $ | Non-consulting Services |
| China Railway Construction Bridge Engineering Bureau Group Co.,Ltd | China | 4 | 47,3 Mio. $ | Works |
| MUHAMMAD AMINUL HAQUE (PVT.) LTD. | Bangladesch | 4 | 47,3 Mio. $ | Works |
| CHINA RAILWAY NO. 4 ENGINEERING GROUP CO. LTD. | China | 1 | 44,6 Mio. $ | Works |
| WORLD FOOD PROGRAMME (WFP) | World | 2 | 41,7 Mio. $ | Non-consulting Services |
| TOMA CONSTRUCTION AND CO. LTD. | Bangladesch | 1 | 37,4 Mio. $ | Works |
| UNITED NATIONS POPULATION FUND (UNFPA) | World | 5 | 37,1 Mio. $ | Non-consulting Services |
| WAHID CONSTRUCTION LTD. (WCL) | Bangladesch | 4 | 31,9 Mio. $ | Works |
| TIANEN CONSTRUCTION GROUP CO., LTD. | China | 3 | 31,5 Mio. $ | Works |
| INDIVIDUAL CONSULTANT | Bangladesch | 419 | 24,4 Mio. $ | Consultant Services |
| M JAMAL & COMPANY LIMITED | Bangladesch | 2 | 24,1 Mio. $ | Works |
Zuletzt vergebene Aufträge
| Datum | Unternehmen | Gegenstand | Wert | Verfahren |
|---|---|---|---|---|
| 5. November 2026 | M/S ABSER CONSTRUCTION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Pekua Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 408.000 $ | Request for Bids |
| 5. November 2026 | M/S ABSER CONSTRUCTION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Chakaria Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 1,03 Mio. $ | Request for Bids |
| 4. November 2026 | M/S MIZAN ENTERPRICE | Rehabilitation of 17.968km Emergency Evacuation Rural Road under B-STRONG project (LGED Part) at Burichong Upazila, District: Cumilla. Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,24 Mio. $ | Request for Bids |
| 3. November 2026 | HASSAN TECHNO BUILDERS LTD. | Improvement of Bander tila-Nijumdip (Namar bazar) Road by RCC with Block From Ch: 00-9336m under Hatia Upazila, District: Noakhali. Host and Rohingya Enhancement of Lives Project ↗ | 3,1 Mio. $ | Request for Bids |
| 27. Oktober 2026 | INDIVIDUAL CONSULTANT | Architectural Engineering Consultant Host and Rohingya Enhancement of Lives Project ↗ | 20.200 $ | Individual Consultant Selection |
| 26. Oktober 2026 | INDIVIDUAL CONSULTANT | Consulting Services of Individual Consultant of Waste Management Specialist Bangladesh Resilient Urban and Territorial Development Project ↗ | 105.000 $ | Individual Consultant Selection |
| 26. Oktober 2026 | M/S. ANWARA FOUNDATION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Ukhiya Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 685.000 $ | Request for Bids |
| 26. Oktober 2026 | HASAN ENTERPRISE | Improvement of Incomplete Road (Carry Forward from EMCRP) at Teknaf Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 155.000 $ | Request for Bids |
| 25. Oktober 2026 | INDIVIDUAL CONSULTANT | Procurement of services of Monitoring Engineer Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 82.200 $ | Individual Consultant Selection |
| 25. Oktober 2026 | M/S EMMU CONSTRUCTION | Improvement of Incomplete Road (Carry Forward from EMCRP) at Sadar Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 566.000 $ | Request for Bids |
| 25. Oktober 2026 | K HOSSEN AND CO | Improvement of Incomplete Road (Carry Forward from EMCRP) at Sadar Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 566.000 $ | Request for Bids |
| 25. Oktober 2026 | BIGAPPLE BUILDERS LTD. | Improvement of Incomplete Road (Carry Forward from EMCRP) at Moheskhali Upazila under Cox’s Bazar District Host and Rohingya Enhancement of Lives Project ↗ | 583.000 $ | Request for Bids |
| 19. Oktober 2026 | M/S.QUASHEM CONSTRUCTION | Rehabilitation of 8.285 km Emergency Evacuation Rural Road including re-construction of 9.0 m Box Culvert under B-STRONG project (LGED Part) at Hathazari Upazil Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 800.000 $ | Request for Bids |
| 18. Oktober 2026 | BANGLADESH RURAL ADVANCEMENT COMMITTEE | Skills & Social Development Program at BSMSN, Package no.: PMC-17 R-2-BSMSN-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 1,06 Mio. $ | Fixed Budget Selection |
| 18. Oktober 2026 | GLOBAL BRAND PLC. | Supply and Operation of Desktop Computers Accelerating and Strengthening Skills for Economic Transformation ↗ | 1,59 Mio. $ | Request for Bids |
| 15. Oktober 2026 | PROGOTI INDUSTRIES LIMITED | Procurement of Micro-bus Host and Rohingya Enhancement of Lives Project ↗ | 42.300 $ | Request for Bids |
| 13. Oktober 2026 | TURN | Construction of Solid Waste Management, Package No.: WD-16-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,26 Mio. $ | Request for Bids |
| 13. Oktober 2026 | M/S. ANWARA FOUNDATION | Construction of Solid Waste Management, Package No.: WD-16-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,26 Mio. $ | Request for Bids |
| 11. Oktober 2026 | M/S KHAN TRADERS | Procurement of hose pipe for irrigation scheme (1set equal to 100mm dia 100 m long pipe with related accessories) Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 151.000 $ | Request for Bids |
| 11. Oktober 2026 | INDIVIDUAL CONSULTANT | Individual Local Gender and Sexual Exploitation and Abuse (SEA)/Sexual Harassment (SH) Specialist for PIU Jamuna River Sustainable Management Project 1 ↗ | 21.900 $ | Individual Consultant Selection |
| 8. Oktober 2026 | FAABS INTERNATIONAL | Procurement of 5 KVA Transformer for LLP Scheme Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 46.200 $ | Request for Bids |
| 8. Oktober 2026 | DOHATEC NEW MEDIA | Consulting Services for Overall e-GP Enhancement, Operation and Maintenance (EOM) Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 3,42 Mio. $ | Direct Selection |
| 8. Oktober 2026 | BUET-JAPAN INSTITUTE OF DISASTER PREVENTION AND URBAN SAFETY (BUET-JIDPUS) | Disaster Preparedness Training for Displaced Rohingya Populations in Bhasan Char Host and Rohingya Enhancement of Lives Project ↗ | 210.000 $ | Direct Selection |
| 8. Oktober 2026 | INDIVIDUAL CONSULTANT | Procurement and Contract Management Consultant Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 139.000 $ | Individual Consultant Selection |
| 6. Oktober 2026 | DOCKYARD & ENGINEERING WORKS LIMITED | Construction of Drain Adjacent to Super Dyke at NSEZ, Mirsarai, Chattogram, Package No. : WD-22-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,42 Mio. $ | Request for Bids |
| 6. Oktober 2026 | CSI CONSTRUCTIONS LTD. | Construction of Drain Adjacent to Super Dyke at NSEZ, Mirsarai, Chattogram, Package No. : WD-22-NSEZ-BEZA Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | 2,42 Mio. $ | Request for Bids |
| 5. Oktober 2026 | TRAINING AND TECHNOLOGY TRANSFER LIMITED (TTT LTD.) | Selection of a Firm for Policy Reform Consultancy Service (Firm /International Organization /Development Partner / Others) Technical Assistance for Repurposing of Agricultural Public Support Towards a Sustainable Food System Transformation in ↗ | 88.700 $ | Consultant Qualification Selection |
| 5. Oktober 2026 | BUSINESS INITIATIVE LEADING DEVELOPMENT (BUILD) | Selection of a Firm for Policy Reform Consultancy Service (Firm /International Organization /Development Partner / Others) Technical Assistance for Repurposing of Agricultural Public Support Towards a Sustainable Food System Transformation in ↗ | 88.700 $ | Consultant Qualification Selection |
| 5. Oktober 2026 | MR. U.T.MONG | Improvement of 16.630 km Rural Roads at Subarnachar Upazila in Noakhali District Host and Rohingya Enhancement of Lives Project ↗ | 1,54 Mio. $ | Request for Bids |
| 1. Oktober 2026 | CENTER FOR ENVIRONMENTAL AND GEOGRAPHIC INFORMATION SERVICES (CEGIS) | Environmental Impact and Damage Assessment of the Rohingya Inhabited Area, and a Project Preparation for Ecosystem Restoration with restoration activities Follo Host and Rohingya Enhancement of Lives Project ↗ | 117.000 $ | Quality And Cost-Based Selection |
| 1. Oktober 2026 | MOSTUFA ZAMAN TRADERS (PVT) LTD. | Rehabilitation of 17.554 km Emergency Evacuation Rural Road under B-STRONG project (LGED Part) at Brahmanpara Upazila, District: Cumilla. Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 2,32 Mio. $ | Request for Bids |
| 29. September 2026 | DOHATEC NEW MEDIA | Consulting Services for “Enhancement, Operation and Maintenance of e-PMIS for IMED” Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 1,44 Mio. $ | Direct Selection |
| 29. September 2026 | M/S HOSSAIN ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 602.000 $ | Request for Bids |
| 29. September 2026 | M/S. MOON ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 602.000 $ | Request for Bids |
| 28. September 2026 | IOTA CONSULTING BD | Consulting services for Assisting BPPA to Continue ISO 27001, 9001, 14001, 22301 certifications and achieve TIA 942 Certification for Bangladesh e-GP System for Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 49.400 $ | Consultant Qualification Selection |
| 28. September 2026 | SHUSHILAN | Implementation Support Firm for EGPP+ Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 199.000 $ | Quality And Cost-Based Selection |
| 28. September 2026 | TRAINING AND TECHNOLOGY TRANSFER (TTT) | Implementation Support Firm for EGPP+ Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 199.000 $ | Quality And Cost-Based Selection |
| 28. September 2026 | AL-AMIN TRADERS | Rehabilitation of 14.272 km Emergency Evacuation Rural Road including Re-construction of 16.0 m Box Culvert and 45.0m Arch Bridge under B-STRONG project at Begu Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,13 Mio. $ | Request for Bids |
| 28. September 2026 | KALAI MOLLAH CONSTRUCTION | Rehabilitation of 14.272 km Emergency Evacuation Rural Road including Re-construction of 16.0 m Box Culvert and 45.0m Arch Bridge under B-STRONG project at Begu Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,13 Mio. $ | Request for Bids |
| 28. September 2026 | M/S HOSSAIN ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya,Chakaria and Moheshkhali Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 663.000 $ | Request for Bids |
| 28. September 2026 | M/S. MOON ENTERPRISE | Construction of 04 Nos.Incomplete School cum Disaster Shelter (Carry Forward from EMCRP) at Ukhiya,Chakaria and Moheshkhali Upazila, Distrct: Cox`sBazar. Host and Rohingya Enhancement of Lives Project ↗ | 663.000 $ | Request for Bids |
| 22. September 2026 | SHAPLA ENTERPRISE | Procurement of a) 4 Nos. Working Table b) 4 Nos. Side Table c) 4 Nos. Chair d) 140 sft Cubicle Partition e) 5 Nos. Foot Rest Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 3390 $ | Request for Quotations |
| 22. September 2026 | GLOBAL BRAND PLC. | Supply of Suitable Devices (Supply, Installation, Testing and Commissioning of Campus Network Equipment of Bangladesh Medical University (BMU) and Chittagong Un Higher Education Acceleration and Transformation Project ↗ | 1,59 Mio. $ | Request for Bids |
| 21. September 2026 | MOHAMMED EUNUS & BROTHERS (PVT.) LTD. | Construction of 58 m (2 nos.) RCC Bridge at Hatia Upazila, Noakhali District. Host and Rohingya Enhancement of Lives Project ↗ | 721.000 $ | Request for Bids |
| 20. September 2026 | JIANGSU JUNMA ROAD ROLLER CO., LTD. (China) | Procurement of 42 Nos. Tandem Vibratory Road Roller (8-10.5 Ton) Bangladesh Resilient Urban and Territorial Development Project ↗ | 2 Mio. $ | Request for Bids |
| 20. September 2026 | JIANGSU JUNMA ROAD ROLLER CO., LTD. (China) | Procurement of 39 Nos. Tandem Vibratory Road Roller (8-10.5 Ton) Bangladesh Resilient Urban and Territorial Development Project ↗ | 1,88 Mio. $ | Request for Bids |
| 20. September 2026 | INDIVIDUAL CONSULTANT | Senior Financial management Specialist Strengthening Institutions for Transparency and Accountability (SITA) ↗ | 79.300 $ | Individual Consultant Selection |
| 20. September 2026 | M/S ZAMAN TRADERS | Rehabilitation of 13.408 km Emergency Evacuation Rural Road including re-construction of 23.30 m Box Culvert under B-STRONG project (LGED Part) at Chhagalnaiya Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,44 Mio. $ | Request for Bids |
| 17. September 2026 | MOHAMMED EUNUS & BROTHERS (PVT.) | 4 Nos Construction of Primary School cum Flood Shelter with street light, Lightning protection & connecting roads, bridge/Culvert, Furniture & tree plantation ( Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 2,81 Mio. $ | Request for Bids |
| 15. September 2026 | M I CHOWDHURY & CO. | Internal Audit (Firm) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 42.900 $ | Consultant Qualification Selection |
| 15. September 2026 | INDIVIDUAL CONSULTANT | Program Specialist Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 61.100 $ | Individual Consultant Selection |
| 15. September 2026 | M/S S K M INTERNATIONAL | Rehabilitation of 13.095 km Emergency Evacuation Rural Road including rc-construction of 38.50 m Box Culvert under B-STRONG project (LGED Part) at Chouddagram U Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,97 Mio. $ | Request for Bids |
| 13. September 2026 | M/S. HOQUE TRADERS | Rehabilitation of 10.452 km Emergency Evacuation Rural Road including re-construction of 10.00 m Box Culvert under B-STRONG Project (LGED Part) at Sonagazi Upaz Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 1,23 Mio. $ | Request for Bids |
| 13. September 2026 | SHAIKAT ENTERPRISE | Improvement of Community Infrastructure, Growth Center, others roads & Connecting Roads at Madaripur Districts Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 1,25 Mio. $ | Request for Bids |
| 10. September 2026 | S.F. AHMED AND CO. CHARTERED ACCOUNTANTS | Consulting Services for Professional Audit Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 32.700 $ | Consultant Qualification Selection |
| 10. September 2026 | AL-AMIN TRADERS | Improvement of Community Infrastructure, Growth Center, others roads & Connecting Roads at Faridpur Districts Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | 1,26 Mio. $ | Request for Bids |
| 9. September 2026 | OCEAN ENTERPRISE | MSR (Gauze,Cotton & Others) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 711.000 $ | Request for Bids |
| 9. September 2026 | ANIFCO HEALTHCARE | MSR (Surgical Goods) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 894.000 $ | Request for Bids |
| 9. September 2026 | HTMS LIMITED | MSR (Linen Goods) Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | 87.000 $ | Request for Bids |
| 7. September 2026 | ABUL & BROTHERS (PVT.) LTD | Rehabilitation of 18.54 km Emergency Evacuation of Rural Roads including reconstruction of 7.0m RCC Box Culvert under B Strong(LGED Part) at Ramganj upazila, La Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | 871.000 $ | Request for Bids |
Contract award prices in Bangladesch
The median is the middle amount: half of the contracts are below it, half above. The range goes from the cheapest quarter to the most expensive quarter.
| Type of contract | Contracts | Median | Usual range | Largest contract |
|---|---|---|---|---|
| Goods | 529 | 46.600 $ | 6800 $ – 311.000 $ | 12,8 Mio. $ |
| Works | 817 | 541.000 $ | 86.900 $ – 1,5 Mio. $ | 66,2 Mio. $ |
| Consulting services | 759 | 69.300 $ | 31.500 $ – 180.000 $ | 6,72 Mio. $ |
| Other services | 89 | 145.000 $ | 51.100 $ – 795.000 $ | 40 Mio. $ |
These amounts cover contracts of very different sizes: compare your price with contracts of the same nature and size, and with the project budget if it is published.
Finanzierte Projekte: geplant und laufend
Geplante Projekte werden ihre Ausschreibungen in den kommenden Monaten veröffentlichen. Registrieren Sie sich beim Kreditnehmer als Lieferant und verfolgen Sie seine Bekanntmachungen.
| Projekt | Status | Zugesagter Betrag | Genehmigung | Abschluss | Sektor |
|---|---|---|---|---|---|
| Gas Sector Reform and Energy Security Project ↗ | In Vorbereitung | 350 Mio. $ | |||
| Bangladesh: Digital Service Transformation for Access and Resilience ↗ | In Vorbereitung | 300 Mio. $ | |||
| Bangladesh Growth, Finance and Competitiveness DPC1 ↗ | In Vorbereitung | 250 Mio. $ | |||
| BD PPF ↗ | In Vorbereitung | 50 Mio. $ | |||
| Strengthening Social Protection for Improved Resilience, Inclusion and Targeting ↗ | In Vorbereitung | – | |||
| Bangladesh: Strengthening Governance and Institutional Resilience ↗ | In Vorbereitung | – | |||
| Metro Dhaka Water Security and Resilience Program ↗ | In Vorbereitung | – | |||
| Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project ↗ | In Vorbereitung | – | |||
| Bangladesh Clean Air Project ↗ | In Vorbereitung | – | |||
| BPPF ↗ | In Vorbereitung | – | |||
| Strengthening Institutions for Transparency and Accountability (SITA) ↗ | In Vorbereitung | – | |||
| Financial Sector Support Project II ↗ | In Vorbereitung | – | |||
| Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project ↗ | Laufend | 753 Mio. $ | 28. Juni 2022 | 30. Juni 2028 | Public Administration - Transportation |
| Quality Learning for All Program ↗ | Laufend | 700 Mio. $ | 14. Juni 2018 | 31. Dezember 2024 | Primary Education |
| Bay Terminal Marine Infrastructure Development Project ↗ | Laufend | 650 Mio. $ | 28. Juni 2024 | 30. Juni 2031 | |
| Additional Financing for and Restructuring of the COVID-19 Emergency Response and Pandemic Preparedness Project ↗ | Laufend | 600 Mio. $ | 18. März 2021 | Health | |
| Program on Agricultural and Rural Transformation for Nutrition, Entrepreneurship, and Resilience in Bangladesh(PARTNER) ↗ | Laufend | 543 Mio. $ | 27. April 2023 | 31. Dezember 2028 | Agricultural Extension, Research, and Other Support Activiti |
| Electricity Distribution Modernization Program ↗ | Laufend | 528 Mio. $ | 21. Dezember 2021 | 31. Dezember 2026 | Energy Transmission and Distribution |
| Second Bangladesh Green and Climate Resilient Development Credit ↗ | Laufend | 500 Mio. $ | 19. Dezember 2024 | 15. Januar 2026 | |
| Bangladesh Second Recovery and Resilience DPC ↗ | Laufend | 500 Mio. $ | 21. Juni 2024 | 30. Juni 2025 | |
| Resilient Infrastructure for Adaptation and Vulnerability Reduction ↗ | Laufend | 500 Mio. $ | 15. Juli 2022 | 30. Juni 2028 | Other Public Administration |
| Western Economic Corridor and Regional Enhancement Program ↗ | Laufend | 500 Mio. $ | 23. Juni 2020 | 31. Dezember 2026 | Rural and Inter-Urban Roads |
| Bangladesh Private Investment & Digital Entrepreneurship Project ↗ | Laufend | 500 Mio. $ | 19. Juni 2020 | 31. Dezember 2025 | Other Industry, Trade and Services |
| Livestock and Dairy Development Project ↗ | Laufend | 500 Mio. $ | 6. Dezember 2018 | 31. Juli 2025 | Livestock |
| Safety Net Systems for the Poorest ↗ | Laufend | 500 Mio. $ | 26. Juni 2013 | 31. Dezember 2024 | Social Protection |
| Enhancement and Strengthening of Power Transmission Network in Eastern Region ↗ | Laufend | 451 Mio. $ | 29. März 2018 | 30. Juni 2025 | Renewable Energy Solar |
| Operation for Supporting Rural Bridges (SupRB) ↗ | Laufend | 425 Mio. $ | 25. Oktober 2018 | 30. Juni 2025 | Rural and Inter-Urban Roads |
| Bangladesh Resilient Urban and Territorial Development Project ↗ | Laufend | 400 Mio. $ | 21. Juni 2024 | 31. Oktober 2030 | |
| BD Rural Water, Sanitation and Hygiene for Human Capital Development Project ↗ | Laufend | 400 Mio. $ | 25. September 2020 | 31. Oktober 2025 | Public Administration - Water, Sanitation and Waste Manageme |
| Health, Nutrition and Population Sector Development Program ↗ | Laufend | 379 Mio. $ | 19. Dezember 2024 | 30. Juni 2029 | |
| Multipurpose Disaster Shelter Project ↗ | Laufend | 375 Mio. $ | 16. Dezember 2014 | 31. Dezember 2024 | Other Water Supply, Sanitation and Waste Management |
| Bangladesh Regional Waterway Transport Project 1 ↗ | Laufend | 360 Mio. $ | 16. Juni 2016 | 31. Dezember 2025 | Ports/Waterways |
| Bangladesh Road Safety Project ↗ | Laufend | 358 Mio. $ | 28. März 2022 | 30. Juni 2027 | Rural and Inter-Urban Roads |
| Dhaka Sanitation Improvement Project ↗ | Laufend | 340 Mio. $ | 20. März 2020 | 30. April 2027 | Sanitation |
| Learning Acceleration in Secondary Education Operation ↗ | Laufend | 300 Mio. $ | 22. September 2023 | 31. Dezember 2028 | Secondary Education |
| GAS SECTOR EFFICIENCY IMPROVEMENT AND CARBON ABATEMENT PROJECT ↗ | Laufend | 300 Mio. $ | 27. Juli 2023 | 31. Dezember 2028 | Oil and Gas |
| Economic Acceleration and Resilience for NEET (EARN) ↗ | Laufend | 300 Mio. $ | 29. Juni 2023 | 31. Dezember 2028 | Workforce Development and Vocational Education |
| Local Government COVID-19 Response & Recovery Project ↗ | Laufend | 300 Mio. $ | 24. Februar 2022 | 31. Dezember 2025 | Public Administration - Health |
| Accelerating and Strengthening Skills for Economic Transformation ↗ | Laufend | 300 Mio. $ | 20. Mai 2021 | 31. Dezember 2026 | Workforce Development and Vocational Education |
| Resilience, Entrepreneurship and Livelihood Improvement Project ↗ | Laufend | 300 Mio. $ | 20. Mai 2021 | 28. Mai 2026 | Other Agriculture, Fishing and Forestry |
| Cash Transfer Modernization Project ↗ | Laufend | 300 Mio. $ | 31. Januar 2018 | 31. März 2025 | Social Protection |
| BD: Enhancing Digital Government & Economy Project ↗ | Laufend | 295 Mio. $ | 19. Juni 2020 | 30. September 2025 | Central Government (Central Agencies) |
| Chattogram Water Supply Improvement Project ↗ | Laufend | 280 Mio. $ | 19. Dezember 2024 | 31. Dezember 2030 | |
| Sustainable Microenterprise and Resilient Transformation (SMART) ↗ | Laufend | 250 Mio. $ | 27. April 2023 | 31. Dezember 2028 | Banking Institutions |
| Bangladesh Environmental Sustainability and Transformation Project ↗ | Laufend | 250 Mio. $ | 1. Dezember 2022 | 31. Dezember 2028 | Other Public Administration |
| Safety Net Systems for the Poorest (Additional Financing) ↗ | Laufend | 245 Mio. $ | 15. Dezember 2017 | Public Administration - Social Protection | |
| Bangladesh Scaling-up Renewable Energy Project ↗ | Laufend | 244 Mio. $ | 1. März 2019 | 31. Juli 2025 | Renewable Energy Solar |
| Bangladesh Sustainable Coastal and Marine Fisheries ↗ | Laufend | 240 Mio. $ | 5. Oktober 2018 | 30. Juni 2025 | Fisheries |
| Bangladesh Enhancing Investments and Benefits for Early Years (BEIBEY) Project ↗ | Laufend | 210 Mio. $ | 31. Oktober 2023 | 31. Oktober 2028 | Social Protection |
| Bangladesh Modern Food Storage Facilities Project ↗ | Laufend | 210 Mio. $ | 30. Dezember 2013 | 31. Dezember 2024 | Social Protection |
| Higher Education Acceleration and Transformation Project ↗ | Laufend | 209 Mio. $ | 24. Juni 2021 | 31. Dezember 2027 | Tertiary Education |
| Additional Financing For Modern Food Storage Facilities Project ↗ | Laufend | 202 Mio. $ | 31. Juli 2020 | Other Agriculture, Fishing and Forestry | |
| Urban Health, Nutrition and Population Project ↗ | Laufend | 200 Mio. $ | 30. August 2023 | 31. Dezember 2028 | Public Administration - Health |
| Recovery and Advancement of Informal Sector Employment ↗ | Laufend | 200 Mio. $ | 15. März 2021 | 30. Juni 2026 | Social Protection |
| COVID-19 Emergency Response and Pandemic Preparedness Project ↗ | Laufend | 200 Mio. $ | 3. April 2020 | 31. Dezember 2024 | Health |
| Bangladesh Municipal Water Supply and Sanitation Project ↗ | Laufend | 200 Mio. $ | 11. Juli 2019 | 31. Dezember 2024 | Water Supply |
| Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population ↗ | Laufend | 193 Mio. $ | 28. Mai 2024 | 30. Juni 2028 | |
| Sustainable Forests & Livelihoods (SUFAL) Project ↗ | Laufend | 175 Mio. $ | 5. Oktober 2018 | 30. Juni 2025 | Forestry |
| Emergency Multi-Sector Rohingya Crisis Response Project ↗ | Laufend | 165 Mio. $ | 7. März 2019 | 30. Juni 2025 | Public Administration - Social Protection |
| Health and Gender Support Project for Cox’s Bazar district ↗ | Laufend | 150 Mio. $ | 31. März 2020 | 31. Dezember 2024 | Health |
Ausschreibungen 26 ansehen Lieferanten und Dienstleister in Bangladesch → Alle Länder
Quelle: Weltbank, Contract Awards in Investment Project Financing und Projekt-API, Lizenz CC BY 4.0. Aktualisiert: 17. November 2026. Beträge in US-Dollar.