101 Aufträge, 1,07 Mrd. $, 55 verschiedene Unternehmen. 89 % des Werts gingen an Unternehmen des Landes.
Unternehmen mit den meisten Zuschlägen
| Unternehmen | Herkunftsland | Aufträge | Wert | Hauptkategorie |
|---|---|---|---|---|
| SP SINE MIDAS STROY | Kasachstan | 1 | 222 Mio. $ | Works |
| ABK-AVTODOR NS | Kasachstan | 2 | 164 Mio. $ | Works |
| KAZAKHDORSTROY | Kasachstan | 2 | 163 Mio. $ | Works |
| COMPANY ENERGODOR | Kasachstan | 2 | 163 Mio. $ | Works |
| STECOL CORPORATION | China | 1 | 114 Mio. $ | Works |
| AK ZHOL KURYLYS | Kasachstan | 1 | 114 Mio. $ | Works |
| BRANCH OF JSC KLV INSAAT ANONIM SIRKETI OF THE REPUBLIC OF KAZAKHSTAN | Kasachstan | 4 | 111 Mio. $ | Works |
| INDIVIDUAL CONSULTANT | Kasachstan | 35 | 3,22 Mio. $ | Consultant Services |
| HÄME UNIVERSITY OF APPLIED SCIENCES | Finnland | 1 | 2,76 Mio. $ | Consultant Services |
| ALEKS-ASU | Kasachstan | 1 | 2,17 Mio. $ | Goods |
| BE SUPPLY | Kasachstan | 1 | 1,63 Mio. $ | Goods |
| HEADWAY | Kasachstan | 1 | 1,11 Mio. $ | Goods |
| DONGSUNG ENGINEERING CO., LTD.” IN JOINT VENTURE WITH “DASAN CONSULTANTS CO., LTD” | Nordkorea | 1 | 951.000 $ | Consultant Services |
| IRD ENGINEERING S.R.L. WITH SUB-CONSULTANT LLP «ZHOL-ZHOBA KZ» | Italien | 1 | 781.000 $ | Consultant Services |
| AMKODOR-ASTANA LTD | Kasachstan | 1 | 560.000 $ | Goods |
Zuletzt vergebene Aufträge
| Datum | Unternehmen | Gegenstand | Wert | Verfahren |
|---|---|---|---|---|
| 11. September 2026 | IE AS-GARANT | carrying out installation work on the territory of the arboretum PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 1530 $ | Request for Quotations |
| 10. September 2026 | KITAP | Supply goods for Aksu zhabagyly state institution (Printing and production of a book) PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 17.000 $ | Request for Quotations |
| 10. August 2026 | INDIVIDUAL CONSULTANT | Cross-sectoral Advisor on Legislative Policy (Stock Exchange and Finance) Kazakhstan Partnership for Market Implementation ↗ | 7600 $ | Individual Consultant Selection |
| 31. Juli 2026 | INDIVIDUAL CONSULTANT | Contract Project Coordinator Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 422.000 $ | Individual Consultant Selection |
| 10. Juli 2026 | STECOL CORPORATION (China) | Lot 4 (km 448-583) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 114 Mio. $ | Request for Bids |
| 10. Juli 2026 | AK ZHOL KURYLYS | Lot 4 (km 448-583) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 114 Mio. $ | Request for Bids |
| 10. Juli 2026 | KAZAKHDORSTROY | Lot 2 (km 683-783) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 76,5 Mio. $ | Request for Bids |
| 10. Juli 2026 | COMPANY ENERGODOR | Lot 2 (km 683-783) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 76,5 Mio. $ | Request for Bids |
| 10. Juli 2026 | ABK-AVTODOR NS | Lot 2 (km 683-783) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 76,5 Mio. $ | Request for Bids |
| 10. Juli 2026 | KAZAKHDORSTROY | Lot 1 (km 783-905) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 87 Mio. $ | Request for Bids |
| 10. Juli 2026 | COMPANY ENERGODOR | Lot 1 (km 783-905) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 87 Mio. $ | Request for Bids |
| 10. Juli 2026 | ABK-AVTODOR NS | Lot 1 (km 783-905) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 87 Mio. $ | Request for Bids |
| 10. Juli 2026 | SP SINE MIDAS STROY | Lot 3 (km 583-683) Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor)) ↗ | 222 Mio. $ | Request for Bids |
| 29. Juni 2026 | INCOM | Provision of services regarding the transfer of rights to use the ABC software suite for three workstations Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 1710 $ | Direct Selection |
| 29. Juni 2026 | JSC KAZAKH SCIENTIFIC RESEARCH AND DESIGN INSTITUTE OF CONSTRUCTION AND ARCHITECTURE | Services for the transfer of the right to use the Electronic Submission of the Estimate and Regulatory Base Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 372 $ | Direct Selection |
| 25. Mai 2026 | ASTANA PROFI CONSULTING | SUPPLY GOODS FOR KARATAU STATE INSTITUTION PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 22.000 $ | Request for Quotations |
| 4. Mai 2026 | INDIVIDUAL CONSULTANT | Technical Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 114.000 $ | Individual Consultant Selection |
| 1. April 2026 | INDIVIDUAL CONSULTANT | PMU Monitoring and Evaluation Consultant Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 103.000 $ | Individual Consultant Selection |
| 30. März 2026 | AR BERRY TOURS | Contract No. KZPMI-RFQ-06 - Logistics for RES participants Kazakhstan Partnership for Market Implementation ↗ | 21.200 $ | Request for Quotations |
| 2. März 2026 | INDIVIDUAL CONSULTANT | Technical Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 123.000 $ | Individual Consultant Selection |
| 2. März 2026 | INDIVIDUAL CONSULTANT | Technical Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 129.000 $ | Individual Consultant Selection |
| 2. März 2026 | INDIVIDUAL CONSULTANT | Technical Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 123.000 $ | Individual Consultant Selection |
| 23. Februar 2026 | INDIVIDUAL CONSULTANT | Environmental and Social Development Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 103.000 $ | Individual Consultant Selection |
| 16. Februar 2026 | INDIVIDUAL CONSULTANT | PIU Office-manager/translator Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 51.600 $ | Individual Consultant Selection |
| 11. Februar 2026 | INDIVIDUAL CONSULTANT | Technical Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 115.000 $ | Individual Consultant Selection |
| 11. Februar 2026 | INDIVIDUAL CONSULTANT | Technical Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 115.000 $ | Individual Consultant Selection |
| 11. Februar 2026 | INDIVIDUAL CONSULTANT | Technical Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 116.000 $ | Individual Consultant Selection |
| 28. Januar 2026 | SEVEN HILLS OF KAZAKHSTAN LLP | Maintenance of the software “Configuration “Budget” on the platform “1C” module “World Bank” Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 3570 $ | Direct Selection |
| 5. Januar 2026 | INDIVIDUAL CONSULTANT | PMU Team Leader Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 133.000 $ | Individual Consultant Selection |
| 5. Januar 2026 | INDIVIDUAL CONSULTANT | Procurement Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 122.000 $ | Individual Consultant Selection |
| 5. Januar 2026 | INDIVIDUAL CONSULTANT | Financial Management Specialist Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 122.000 $ | Individual Consultant Selection |
| 5. Januar 2026 | INDIVIDUAL CONSULTANT | Coordinator for Component 1 Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 122.000 $ | Individual Consultant Selection |
| 5. Januar 2026 | INDIVIDUAL CONSULTANT | Contract Administration Consultant Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project ↗ | 115.000 $ | Individual Consultant Selection |
| 1. Dezember 2025 | INDIVIDUAL CONSULTANT | Senior technical consultant for PMU Second Irrigation and Drainage Improvement Project ↗ | 5480 $ | Individual Consultant Selection |
| 21. November 2025 | "BELIJ VETER KZ" | Contract No.KZPMI-RFQ-04 - Office Computer Equipment for PIU Kazakhstan Partnership for Market Implementation ↗ | 14.200 $ | Request for Quotations |
| 21. November 2025 | FELIX ASTANA | Contract No.KZPMI-RFQ-05- Office Furniture for PIU Kazakhstan Partnership for Market Implementation ↗ | 3840 $ | Request for Quotations |
| 29. Oktober 2025 | INDIVIDUAL CONSULTANT | Consultant for PMU Second Irrigation and Drainage Improvement Project ↗ | 2830 $ | Individual Consultant Selection |
| 25. Oktober 2025 | EDINAYA SLUZHBA USLUG | Carrying out landscaping works in the dendropark area (installation of lighting) PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 74.100 $ | Request for Quotations |
| 5. September 2025 | INDIVIDUAL CONSULTANT | Contract No_KZPMI-PIU-IC-05_Technical Coordinator for PIU Kazakhstan Partnership for Market Implementation ↗ | 112.000 $ | Individual Consultant Selection |
| 2. September 2025 | SARYARKAAVTOPROM | Purchasing a bus for transporting tourists in Karatau sanctuary PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 42.400 $ | Request for Quotations |
| 25. August 2025 | AMKODOR-ASTANA LTD | Purchase of special machinery and equipment for cleaning irrigation canals Second Irrigation and Drainage Improvement Project ↗ | 560.000 $ | Request for Bids |
| 15. August 2025 | INDIVIDUAL CONSULTANT | Technical Consultant on Component 1 for PIU Second Irrigation and Drainage Improvement Project ↗ | 5450 $ | Individual Consultant Selection |
| 31. Juli 2025 | TURANGA GROUP | Construction of an observation deck and arrangement of a tourist trail along the excursion route in the Aksu-Right Canyon in the Aksu-Zhabagly Nature Reserve PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 129.000 $ | Request for Quotations |
| 31. Juli 2025 | IE LEONOV M.S. | For the execution of landscaping works in the arboretum territory (construction of a trail network) of Kazakh Research Institute of Forestry and Agroforestry na PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 159.000 $ | Request for Quotations |
| 31. Juli 2025 | "TORGOVYJ DOM ASYL QALA" | Procurement of goods to improve the dendrological park area, including a pedestrian path network, for A.N. Bukeikhan Kazakh Research Institute of Forestry and A PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 107.000 $ | Request for Quotations |
| 25. Juni 2025 | KASKASU LTD I K | IRRIGATION DEVICE FOR A 60 HECTARES ORCHARD IN THE SAIRAM-UGAM STATE NATIONAL PARK (including development of a draft design) PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 192.000 $ | Request for Quotations |
| 16. Juni 2025 | YERLAN SADVAKASSOV | PMU Coordinator Second Irrigation and Drainage Improvement Project ↗ | 20.700 $ | Direct Selection |
| 4. Juni 2025 | DONGSUNG ENGINEERING CO., LTD.” IN JOINT VENTURE WITH “DASAN CONSULTANTS CO., LTD” (Nordkorea) | Supervision services Uzynagash-Otar, km 101-143 East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - ↗ | 951.000 $ | Direct Selection |
| 5. Mai 2025 | INDIVIDUAL CONSULTANT | Contract No.KZPMI-PIU-IC-01- Project Implementation Unit Coordinator Kazakhstan Partnership for Market Implementation ↗ | 141.000 $ | Individual Consultant Selection |
| 5. Mai 2025 | INDIVIDUAL CONSULTANT | Contract No.KZPMI-PIU-IC-02- Project Implementation Unit Procurement Specialist Kazakhstan Partnership for Market Implementation ↗ | 124.000 $ | Individual Consultant Selection |
| 5. Mai 2025 | INDIVIDUAL CONSULTANT | Contract NoKZPMI-PIU-IC-04 for Social and Environmental Specialist for PMU Kazakhstan Partnership for Market Implementation ↗ | 38.000 $ | Individual Consultant Selection |
| 5. Mai 2025 | INDIVIDUAL CONSULTANT | Contract No.KZPMI-PIU-IC-03- Project Implementation Unit Financial Management Specialist Kazakhstan Partnership for Market Implementation ↗ | 124.000 $ | Individual Consultant Selection |
| 2. Mai 2025 | BRANCH OF JSC KLV INSAAT ANONIM SIRKETI OF THE REPUBLIC OF KAZAKHSTAN | reconstruction works Uzynagash-Otar, km 101-143 East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - ↗ | 16,8 Mio. $ | Direct Selection |
| 2. Mai 2025 | BRANCH OF JSC KLV INSAAT ANONIM SIRKETI OF THE REPUBLIC OF KAZAKHSTAN | reconstruction works Kurty-Burylbaital, km 2335-2380 East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - ↗ | 6,66 Mio. $ | Direct Selection |
| 2. Mai 2025 | BRANCH OF JSC KLV INSAAT ANONIM SIRKETI OF THE REPUBLIC OF KAZAKHSTAN | reconstruction works Kurty-Burylbaital, km 2295-2335 East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - ↗ | 11,4 Mio. $ | Direct Selection |
| 1. April 2025 | PANA ASIA | Installation of a modular Visitor Center made of lightweight, prefabricated, and demountable structures for the Karatau State Nature Reserve PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 318.000 $ | Request for Quotations |
| 1. April 2025 | TURANGA GROUP | Works for the installation of a modular Visitor Center using lightweight prefabricated and demountable structures for the Sayram-Ugam State National Nature Park PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 323.000 $ | Request for Quotations |
| 31. März 2025 | IE ZHUMAGALIYEVA A.B. | Works on installing a fence for an ochard on an area of 136 ha in the Sayram Ugam State Nature reserve (including of a preminary design) PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 28.100 $ | Request for Quotations |
| 2. März 2025 | IRD ENGINEERING S.R.L. WITH SUB-CONSULTANT LLP «ZHOL-ZHOBA KZ» (Italien) | Supervision services Kurty-Burylbaital, km 2295-2380 East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - ↗ | 781.000 $ | Direct Selection |
| 26. Februar 2025 | IE PMP GROUP | Supply of goods for fencing an orchard on an area of 136 ha in the Sayram Ugam state Natural Park. PROGREEN Kazakhstan Resilient Landscapes Restoration Project ↗ | 118.000 $ | Request for Quotations |
Contract award prices in Kasachstan
The median is the middle amount: half of the contracts are below it, half above. The range goes from the cheapest quarter to the most expensive quarter.
| Type of contract | Contracts | Median | Usual range | Largest contract |
|---|---|---|---|---|
| Goods | 24 | 26.200 $ | 5200 $ – 110.000 $ | 2,17 Mio. $ |
| Works | 21 | 16,8 Mio. $ | 192.000 $ – 87 Mio. $ | 222 Mio. $ |
| Consulting services | 47 | 122.000 $ | 25.900 $ – 151.000 $ | 2,76 Mio. $ |
| Other services | 9 | 1540 $ | 410 $ – 1930 $ | 21.200 $ |
These amounts cover contracts of very different sizes: compare your price with contracts of the same nature and size, and with the project budget if it is published.
Finanzierte Projekte: geplant und laufend
Geplante Projekte werden ihre Ausschreibungen in den kommenden Monaten veröffentlichen. Registrieren Sie sich beim Kreditnehmer als Lieferant und verfolgen Sie seine Bekanntmachungen.
Ausschreibungen 2 ansehen Lieferanten und Dienstleister in Kasachstan → Alle Länder
Quelle: Weltbank, Contract Awards in Investment Project Financing und Projekt-API, Lizenz CC BY 4.0. Aktualisiert: 17. November 2026. Beträge in US-Dollar.